Cehia, Guri de sondă, SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS
Obiectul contractului
Cehia, Guri de sondă, SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS
Descriere
This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.
- Tip anunț
- Anunț de participare, Anunț de participare (UE)
- Autoritate contractantă
- Univerzita Karlova
- Cod CPV
- 43612400
- Data publicării
- 01.10.2026
- Termen de depunere
- 06.11.2026 00:59 (21 zile rămase)
- Identificator
- 674260-2026
Documentația și asistentul cer un cont. Caietul de sarcini, întrebările despre cerințele acestui anunț și verificarea automată a potrivirii cu profilul firmei tale sunt disponibile în aplicație. Intră în cont ca să le folosești.
Anunțul oficial
Deschide în TEDDatele de mai sus sunt preluate automat. Sursa oficială rămâne singura cu valoare juridică.